CGW were the lead designers for this 50 lot subdivision for Horncastle homes in Christchurch. We designed the subdivision layout including all roading, services and infrastructure
Christchurch Polytechnic Institute of Technology Campus Drainage Assessment
CGW worked with PACE Project Management to undertake the assessment of approx. $7M worth of drainage infrastructure for insurance purposes post Canterbury Earthquake sequence. This project involved the coordination of survey work both above and below ground, reviewing of a significant amount of CTV footage and detailed locating and mapping of services to assist CPIT to understand the extent of damage
Nelson Airport Redevelopment
CGW are the civil engineering consultant for pavement and hardstand design for the 48,000m² of landside area and land interface including designing all potable water and fire main infrastructure, sewer diversions and stormwater for existing areas and new car parking. CGW are also the consultants for the geotechnical investigation and terminal pile design for the new 6,000m² terminal building and the new control tower for Airways New Zealand


